FUJAIRAH CEMENT WORKS, UAE
main clinker

Seven silos were slipformed on the Emirates Cement site just south of Ras AL Khaimah during the summer of 2006. A total of nearly 60,000m² of slipforming was undertaken all through the intense summer heat.
Seven structures were constructed

  • 4 no. Cement Silos of 20m i.d
  • Clinker Silo 40m i.d.
  • Raw Meal Silo 20m i.d. 85m high
  • Off Standard Silo 14m i.d.

All of the structures were heavily reinforced and it was decided that planned stops would be made to allow the installation of embedment plates and heavy reinforcement. The Slipform Middle East heavy duty equipment was ideally suited for this type of work.